One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Ordinary Sand mine, Village- Leelapur (Gata No.-659/11) Area- 5.115 ha. Tehsil-…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Nov 2022 |
| Application filed | 25 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Krishn Yadav |
| Land area | 12.7 acres (5.1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Lilapur |
| Taluk / tehsil | Ghazipur |
| District | Ghazipur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00099 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 14 Aug 2024 | Environmental approval granted | 12.7 acres | ₹2.5 crore |
| New project filed 25 Nov 2022 (this page) | Environmental approval granted | 12.7 acres | ₹2.5 crore |
In context
9 applications in Ghazipur since January 2022 are in the same category (Mining): 7 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Lilapur, Ghazipur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Ordinary Sand mine, Village- Leelapur (Gata No.-659/11) Area- 5.115… — environmental approval granted, 0 m away
- Riverbed "Sand Mining" on the Riverbed of Ganga River at Gata No. 151/2,… — environmental approval granted, 1.9 km away
- Riverbed "Sand Mining" on the Riverbed of Ganga River at Gata No. 151/2,… — cleared for impact study, 1.9 km away
- "Ordinary Sand Mining" from Riverbed of Ganga River — under environmental review, 2.1 km away
- Proposed Forest Land to be diverted for Construction of 02 Lane Railway Over… — forest land use approved, 10.4 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — more information requested, 11.8 km away
- Proposal of re-diversion for Jio Digital Fibre Private Limited Project for… — forest land use approved, 12.2 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 12.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.