Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ganga River at Village- Kuchora Gangbarar, Gata/Arazi No.- 1005/1, 1005/2, Lease Area- 5.00 ha., Tehsil- Ghazipur, District- Ghazipur, Uttar Pradesh, Project Proponent- M/s Raghukul Enterprises/372563 (Prop.- Smt. Shanti Devi) |
|---|---|
| Status | Under environmental review |
| Status since | 29 May 2026 |
| Application filed | 30 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shanti Devi |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Kuchaura Gangbarar |
| Taluk / tehsil | Ghazipur |
| District | Ghazipur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02809 |
In context
9 applications in Ghazipur since January 2022 are in the same category (Mining): 7 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval.
1 other mining lease has applied within 500 m of this site; together with this one they cover 18.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Kuchaura Gangbarar, Ghazipur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed "Sand Mining" on the Riverbed of Ganga River at Gata No. 151/2,… — environmental approval granted, 200 m away
- Riverbed "Sand Mining" on the Riverbed of Ganga River at Gata No. 151/2,… — cleared for impact study, 200 m away
- Riverbed Ordinary Sand mine, Village- Leelapur (Gata No.-659/11) Area- 5.115… — environmental approval granted, 2.1 km away
- Riverbed Ordinary Sand mine, Village- Leelapur (Gata No.-659/11) Area- 5.115… — environmental approval granted, 2.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 10.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — in-principle approval, conditions pending, 11.2 km away
- Proposed Forest Land to be diverted for Construction of 02 Lane Railway Over… — forest land use approved, 12.4 km away
- Proposal of re-diversion for Jio Digital Fibre Private Limited Project for… — forest land use approved, 13.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.