Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet at Village: - Nasratpur Urf Harpur, Tehsil: - Zamania, District: - Ghazipur. |
|---|---|
| Status | Forest land use approved |
| Status since | 6 Feb 2025 |
| Application filed | 11 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1,600 m² |
| Forest land | 350 m² |
| Project cost | ₹55 lakh |
| Village / locality | Nasratpur Urf Harpur |
| Taluk / tehsil | Zamania |
| District | Ghazipur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05179 |
In context
7 applications in Ghazipur since January 2022 are in the same category (Fuel stations): 4 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nasratpur Urf Harpur, Zamania, Ghazipur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — in-principle approval, conditions pending, 3.7 km away
- "Ordinary Sand Mining" from Riverbed of Ganga River — under environmental review, 10.6 km away
- Riverbed "Sand Mining" on the Riverbed of Ganga River at Gata No. 151/2,… — environmental approval granted, 10.8 km away
- Riverbed "Sand Mining" on the Riverbed of Ganga River at Gata No. 151/2,… — cleared for impact study, 10.8 km away
- Riverbed Ordinary Sand mine, Village- Leelapur (Gata No.-659/11) Area- 5.115… — environmental approval granted, 12.3 km away
- Riverbed Ordinary Sand mine, Village- Leelapur (Gata No.-659/11) Area- 5.115… — environmental approval granted, 12.3 km away
- Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No.… — lapsed, 15.7 km away
- Riverbed Ordinary Sand mine from Riverbed of Ganga River located at Gata No.… — cleared for impact study, 15.7 km away
More from Indian Oil Corporation Limited (IOCL) in Ghazipur
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.