Quick answers
What is this project?
"Ordinary Soil Excavation Project" at Gata No.- 116, Village- Kakraora, Tehsil- Safipur, District- Unnao, U.P. (Area – 1.0120 ha) is an approved mining project in Kakraura, Safipur, Unnao, Uttar Pradesh. The site covers 1.2 acres.
Who is building it?
The applicant is Kamlesh Kumari.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Nov 2022), as of 27 Nov 2026.
Where is it?
In Kakraura, Safipur, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹12 lakh and a site of 1.2 acres.
When was it filed?
The application was filed on 13 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Nov 2022 |
| Application filed | 13 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kamlesh Kumari |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Kakraura |
| Taluk / tehsil | Safipur |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00173 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.2 acres, this one is smaller than 94% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Kakraura, Safipur, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 400 m away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 500 m away
- "Ordinary Earth Mine", Village- Ahmadabad Mathar, Tehsil-Safipur, District-… — environmental approval granted, 3.1 km away
- "Ordinary Soil Mining Project" at Gata No.- 541 & 543 — environmental approval granted, 3.3 km away
- Proposed "Ordinary Soil Mining Project" at Gata No.- 60 by Shri Abhishek Kumar… — under environmental review, 3.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — lapsed, 7.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 7.2 km away
- Proposed "Ordinary Soil Mining Project" at Gata No.- 254 & 267 — environmental approval granted, 7.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.