Quick answers
What is "Ordinary Soil Mining Project" at Gata No.- 541 & 543?
"Ordinary Soil Mining Project" at Gata No.- 541 & 543 is an approved mining project in Ahmadabad Mathar, Safipur, Unnao, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Vivek Mishraa.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Dec 2025), as of 27 Nov 2026.
Where is it?
In Ahmadabad Mathar, Safipur, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹17 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 6 Sept 2025.
Project details
| Official title | "Ordinary Soil Mining Project" at Gata No.- 541 & 543 in Village-Ahamdabad Mathar, Tehsil-Safipur, District- Unnao, Uttar Pradesh. (Lease Area: 1.001 Ha.) |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Dec 2025 |
| Application filed | 6 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vivek Mishraa |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Ahmadabad Mathar |
| Taluk / tehsil | Safipur |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03774 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 55% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Ahmadabad Mathar, Safipur, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mine", Village- Ahmadabad Mathar, Tehsil-Safipur, District-… — environmental approval granted, 1.9 km away
- Proposed "Ordinary Soil Mining Project" at Gata No.- 60 by Shri Abhishek Kumar… — under environmental review, 2.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 3.2 km away
- "Ordinary Soil Excavation Project" at Gata No.- 116, Village- Kakraora,… — environmental approval granted, 3.3 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 3.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — lapsed, 4.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 4.4 km away
- Ordinary Soil Excavation Project at Gata No.- 754, Village- Hafijabad,… — under environmental review, 8.5 km away
More from Vivek Mishraa in Unnao
- "Ordinary Earth Mine", Village- Ahmadabad Mathar, Tehsil-Safipur, District-… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.