What is Developing? Open the mapMap

Forest land use approvedFuel stations · Unnao, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet is an approved fuel station in Katighara, Safipur, Unnao, Uttar Pradesh. The site covers 1 acre. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 25 Mar 2026).

See it on the live map All projects in Unnao

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet is an approved fuel station in Katighara, Safipur, Unnao, Uttar Pradesh. The site covers 1 acre.

Who is building it?

The applicant is Bharat Petroleum Corporation Limited (BPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 25 Mar 2026), as of 27 Nov 2026.

Where is it?

In Katighara, Safipur, Unnao, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 1 acre and 2,870 m² of forest land.

When was it filed?

The application was filed on 12 Sept 2025.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail Outlet at Village:- Kathighara, Tehsil:- Bangarmau, District:- Unnao.
StatusForest land use approved
Status since25 Mar 2026
Application filed12 Sept 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantBharat Petroleum Corporation Limited (BPCL)
Land area1 acres (0.4 ha)
Forest land2,870 m²
Project cost₹55 lakh
Village / localityKatighara
Taluk / tehsilSafipur
DistrictUnnao
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06758

In context

13 applications in Unnao since January 2022 are in the same category (Fuel stations): 9 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1 acre, this one is larger than 69% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Katighara, Safipur, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharat Petroleum Corporation Limited (BPCL) in Unnao

4 Bharat Petroleum Corporation (BPCL) projects in Unnao
All 656 Bharat Petroleum Corporation (BPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.