Quick answers
What is this project?
Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da Mi Village/ghat- Manjha Salarpur, Tehsil-tanda, District– Ambedkar Nagar (U.p.) Developed By Shri Ravindra Kumar S/o Late Rajkishor is a proposed mining project in Jaipur, Harraiya, Basti, Uttar Pradesh. The site covers 13 acres.
Who is building it?
The applicant is Ravindra Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Oct 2022), as of 27 Nov 2026.
Where is it?
In Jaipur, Harraiya, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 13 acres.
When was it filed?
The application was filed on 11 Oct 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da Mi…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Oct 2022 |
| Application filed | 11 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ravindra Kumar |
| Land area | 13 acres (5.3 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Jaipur |
| Taluk / tehsil | Harraiya |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00242 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Mar 2023 | Environmental approval granted | 13 acres | ₹1.1 crore |
| Early planning filed 11 Oct 2022 (this page) | Cleared for impact study | 13 acres | ₹1.1 crore |
In context
18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 13 acres, this one is larger than 50% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Jaipur, Harraiya, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da… — environmental approval granted, 0 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — initial checks, 7.8 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 7.8 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — environmental approval granted, 8.1 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 8.1 km away
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — under environmental review, 8.5 km away
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — cleared for impact study, 8.5 km away
- Ordinary Sand Mining Project — environmental approval granted, 15.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.