What is Developing? Open the mapMap

Cleared for impact studyMining · Basti, Uttar Pradesh

Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da Mi Village/ghat- Manjha Salarpur, Tehsil-tanda, District– Ambedkar Nagar (U.p.) Developed By Shri Ravindra Kumar S/o Late Rajkishor

Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da Mi Village/ghat- Manjha Salarpur, Tehsil-tanda, District– Ambedkar Nagar (U.p.) Developed By Shri Ravindra Kumar S/o Late Rajkishor is a proposed mining project in Jaipur, Harraiya, Basti, Uttar Pradesh. The site covers 13 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 11 Oct 2022).

See it on the live map All projects in Basti

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da Mi Village/ghat- Manjha Salarpur, Tehsil-tanda, District– Ambedkar Nagar (U.p.) Developed By Shri Ravindra Kumar S/o Late Rajkishor is a proposed mining project in Jaipur, Harraiya, Basti, Uttar Pradesh. The site covers 13 acres.

Who is building it?

The applicant is Ravindra Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 11 Oct 2022), as of 27 Nov 2026.

Where is it?

In Jaipur, Harraiya, Basti, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 13 acres.

When was it filed?

The application was filed on 11 Oct 2022.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da Mi…

Project details

StatusCleared for impact study
Status since11 Oct 2022
Application filed11 Oct 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRavindra Kumar
Land area13 acres (5.3 ha)
Project cost₹1.1 crore
Village / localityJaipur
Taluk / tehsilHarraiya
DistrictBasti
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00242

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 27 Mar 2023Environmental approval granted13 acres₹1.1 crore
Early planning filed 11 Oct 2022 (this page)Cleared for impact study13 acres₹1.1 crore

In context

18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 13 acres, this one is larger than 50% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Jaipur, Harraiya, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.