Quick answers
What is this project?
Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata No. 1164/94, Area 15.40 ha is a proposed mining project in Majha Khurd, Basti, Uttar Pradesh. The site covers 38.1 acres.
Who is building it?
The applicant is Dheerendra Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Majha Khurd, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹48 lakh and a site of 38.1 acres.
When was it filed?
The application was filed on 10 Jun 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata No. 1164/94,…
Project details
| Official title | Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata No. 1164/94, Area 15.40 ha in Village- Majha Khurd, Tehsil- Basti Sadar, District- Basti, Uttar Pradesh of M/s Shri Ram Traders, Prop. Dheerendra Gupta |
|---|---|
| Status | Under environmental review |
| Status since | 2 Oct 2026 |
| Application filed | 10 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dheerendra Gupta |
| Land area | 38.1 acres (15.4 ha) |
| Project cost | ₹48 lakh |
| Village / locality | Majha Khurd |
| Taluk / tehsil | Basti |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04922 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jun 2026 (this page) | Under environmental review | 38.1 acres | ₹48 lakh |
| Early planning filed 27 Oct 2025 | Cleared for impact study | 38.1 acres | ₹48 lakh |
In context
18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 38.1 acres, this one is larger than 78% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 41.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Majha Khurd, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — cleared for impact study, 0 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — environmental approval granted, 500 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 500 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — initial checks, 750 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 750 m away
- Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da… — environmental approval granted, 8.5 km away
- Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da… — cleared for impact study, 8.5 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — cleared for impact study, 15.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.