What is Developing? Open the mapMap

Cleared for impact studyMining · Basti, Uttar Pradesh

"Ordinary Sand Mining" from Riverbed of Ghaghara River

"Ordinary Sand Mining" from Riverbed of Ghaghara River is a proposed mining project in Majha Khurd, Basti, Uttar Pradesh. The site covers 3.2 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 19 May 2025).

See it on the live map All projects in Basti

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Ordinary Sand Mining" from Riverbed of Ghaghara River?

"Ordinary Sand Mining" from Riverbed of Ghaghara River is a proposed mining project in Majha Khurd, Basti, Uttar Pradesh. The site covers 3.2 acres.

Who is building it?

The applicant is Arun Kumar Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 19 May 2025), as of 27 Nov 2026.

Where is it?

In Majha Khurd, Basti, Uttar Pradesh.

How big is it?

It has a stated cost of ₹80 lakh and a site of 3.2 acres.

When was it filed?

The application was filed on 30 Jan 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" from Riverbed of Ghaghara River

Project details

Official title"Ordinary Sand Mining" from Riverbed of Ghaghara River at Village- Majha Khurd, Gata No.- 1164/33ka, 1164ka/51, Lease Area- 1.290 Ha., Tehsil- Basti Sadar, District- Basti, Uttar Pradesh, Project Proponent- Shri Arun Kumar Singh
StatusCleared for impact study
Status since19 May 2025
Application filed30 Jan 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantArun Kumar Singh
Land area3.2 acres (1.3 ha)
Project cost₹80 lakh
Village / localityMajha Khurd
Taluk / tehsilBasti
DistrictBasti
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02829

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Oct 2025Environmental approval granted3.2 acres₹80 lakh
Early planning filed 30 Jan 2025 (this page)Cleared for impact study3.2 acres₹80 lakh

In context

18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.2 acres, this one is smaller than 83% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 44.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.

Where it is

Majha Khurd, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.