Quick answers
What is "Ordinary Sand Mining" from Riverbed of Ghaghara River?
"Ordinary Sand Mining" from Riverbed of Ghaghara River is a proposed mining project in Majha Khurd, Basti, Uttar Pradesh. The site covers 3.2 acres.
Who is building it?
The applicant is Arun Kumar Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 May 2025), as of 27 Nov 2026.
Where is it?
In Majha Khurd, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 30 Jan 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" from Riverbed of Ghaghara River
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ghaghara River at Village- Majha Khurd, Gata No.- 1164/33ka, 1164ka/51, Lease Area- 1.290 Ha., Tehsil- Basti Sadar, District- Basti, Uttar Pradesh, Project Proponent- Shri Arun Kumar Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 May 2025 |
| Application filed | 30 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Arun Kumar Singh |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Majha Khurd |
| Taluk / tehsil | Basti |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02829 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Oct 2025 | Environmental approval granted | 3.2 acres | ₹80 lakh |
| Early planning filed 30 Jan 2025 (this page) | Cleared for impact study | 3.2 acres | ₹80 lakh |
In context
18 applications in Basti since January 2022 are in the same category (Mining): 16 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.2 acres, this one is smaller than 83% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 44.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Majha Khurd, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — environmental approval granted, 0 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — initial checks, 450 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 450 m away
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — under environmental review, 500 m away
- Proposed project of Riverbed of Ghaghara River Ordinary Sand Mining at Gata… — cleared for impact study, 500 m away
- Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da… — environmental approval granted, 8.1 km away
- Riverbed Sand Mine From Riverbed Of Ghaghra/suryu River Khasra/Gata no. 56 Da… — cleared for impact study, 8.1 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — cleared for impact study, 15.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.