What is Developing? Open the mapMap

Cleared for impact studyIndustry · Meerut, Uttar Pradesh

Expansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To 80 KLD

Expansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To 80 KLD is a proposed industrial project in Khiwai, Sardhana, Meerut, Uttar Pradesh. The site covers 7.6 acres. Its stated project cost is ₹95 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 7 Oct 2022).

See it on the live map All projects in Meerut

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To 80 KLD

Project details

Official titleExpansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To 80 KLD along with 2.0 MW Co Gen Power at Khasra No – 494chha, 549ka, 549ga, 549kha, 565, 549gha, Total Area – 3.056 Hectare, Village: Khiwai, Block: Sarurpur, Tehsil: Sardhana, District: Meerut (U.P.) by M/s RCP Distilleries (India) Private Limited.
StatusCleared for impact study
Status since7 Oct 2022
Application filed7 Oct 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRcp Distilleries (India) Private Limited
Land area7.6 acres (3.1 ha)
Project cost₹95 crore
Village / localityKhiwai
Taluk / tehsilSardhana
DistrictMeerut
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00244

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 13 Apr 2023Environmental approval granted7.6 acres₹95 crore
Early planning filed 7 Oct 2022 (this page)Cleared for impact study7.6 acres₹95 crore

In context

18 applications in Meerut since January 2022 are in the same category (Industry): 11 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.6 acres, this one is smaller than 61% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khiwai, Sardhana, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.