Project details
| Official title | Expansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To 80 KLD along with 2.0 MW Co Gen Power at Khasra No – 494chha, 549ka, 549ga, 549kha, 565, 549gha, Total Area – 3.056 Hectare, Village: Khiwai, Block: Sarurpur, Tehsil: Sardhana, District: Meerut (U.P.) by M/s RCP Distilleries (India) Private Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Apr 2023 |
| Application filed | 13 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Rcp Distilleries (India) Private Limited |
| Land area | 7.6 acres (3.1 ha) |
| Project cost | ₹95 crore |
| Village / locality | Khiwai |
| Taluk / tehsil | Sardhana |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01299 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 13 Apr 2023 (this page) | Environmental approval granted | 7.6 acres | ₹95 crore |
| Early planning filed 7 Oct 2022 | Cleared for impact study | 7.6 acres | ₹95 crore |
In context
18 applications in Meerut since January 2022 are in the same category (Industry): 11 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.6 acres, this one is smaller than 61% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khiwai, Sardhana, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To… — cleared for impact study, 0 m away
- Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with… — cleared for impact study, 4.1 km away
- Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with… — lapsed, 5.3 km away
- Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with… — returned to applicant, 5.3 km away
- Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with… — returned to applicant, 6.2 km away
- Expansion of existing distillery unit capacity from 200 KLD to 840 KLD by… — environmental approval granted, 7.7 km away
- Bharti Airtel Ltd. 5G OFC Project Baraut -Saidbahar-Meerut route DFO Meerut — lapsed, 14.5 km away
- Bharti Airtel Ltd. 5G OFC Project Baraut -Saidbahar-Meerut route DFO Meerut — lapsed, 14.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.