One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with production…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 23 Dec 2024 |
| Application filed | 4 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Mantung Organics Private Limited |
| Land area | 8.7 acres (3.5 ha) |
| Project cost | ₹10 crore |
| Village / locality | Lahaurgarh |
| Taluk / tehsil | Meerut |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02370 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Sept 2025 | Lapsed | 8.7 acres | ₹10 crore |
| New project filed 4 Dec 2024 (this page) | Returned to applicant | 8.7 acres | ₹10 crore |
| New project filed 18 Dec 2023 | Returned to applicant | 5.8 acres | ₹10 crore |
| Early planning filed 12 Nov 2022 | Cleared for impact study | 5.8 acres | ₹10 crore |
In context
18 applications in Meerut since January 2022 are in the same category (Industry): 11 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.7 acres, this one is larger than 50% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lahaurgarh, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with… — lapsed, 0 m away
- Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with… — returned to applicant, 1 km away
- Proposed Manufacturing Unit of Ethyl Acetate and or Butyl Acetate Plant with… — cleared for impact study, 1.4 km away
- Expansion of existing distillery unit capacity from 200 KLD to 840 KLD by… — environmental approval granted, 3.3 km away
- Expansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To… — environmental approval granted, 5.3 km away
- Expansion of proposed Grain Based Ethanol Distillery Capacity from 50 KLD To… — cleared for impact study, 5.3 km away
- Amended BharatNet (Rohta-Rithani-Meerut) — lapsed, 10.8 km away
- Diversion of forest land for approach access to Haveli Restaurant at 82 Mile,… — lapsed, 11.1 km away
All 4 Mantung Organics projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.