Quick answers
What is River Bed Sand/ Morrum Mining?
River Bed Sand/ Morrum Mining is a proposed mining project in Lohargawan, Tahrauli, Jhansi, Uttar Pradesh. The site covers 30 acres.
Who is building it?
The applicant is Harsh Sahu.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Nov 2023), as of 27 Nov 2026.
Where is it?
In Lohargawan, Tahrauli, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 30 acres.
When was it filed?
The application was filed on 21 Nov 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Nov 2023 |
| Application filed | 21 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Harsh Sahu |
| Land area | 30 acres (12.1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Lohargawan |
| Taluk / tehsil | Tahrauli |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00314 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Oct 2026 | Under environmental review | 30 acres | ₹1 crore |
| Early planning filed 21 Nov 2023 (this page) | Cleared for impact study | 30 acres | ₹1 crore |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30 acres, this one is larger than 78% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Lohargawan, Tahrauli, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Sand/ Morrum Mining — under environmental review, 0 m away
- Environmental clearance for proposed Sand/Morrum mining from River bed of… — environmental approval granted, 1.3 km away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 2.1 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 2.2 km away
- Area 1.526 Ha Khanda Boulder Gitti Bailast Mining Project At Araji No.773,… — environmental approval granted, 2.5 km away
- Building Stone (Khanda, Gitti, Boulder, Ballast) Mining Project — environmental approval granted, 2.5 km away
- Building Stone (Khanda, Giiti, Boulder, Ballast) Mining Project — withdrawn, 2.5 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — lapsed, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.