Quick answers
What is this project?
Environmental clearance for proposed Sand/Morrum mining from River bed of Betwa River, at Araji No. 364, Khand No.01, Area - 4.750 ha is an approved mining project in Dedar, Tahrauli, Jhansi, Uttar Pradesh. The site covers 11.7 acres.
Who is building it?
The applicant is Sushil Kumar Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Dedar, Tahrauli, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 11.7 acres.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Official title | Environmental clearance for proposed Sand/Morrum mining from River bed of Betwa River, at Araji No. 364, Khand No.01, Area - 4.750 ha at Village-Dedar, Tehsil- Moth, District- Jhansi. Uttar Pradesh of M/s Sushil Stone Gramodyog, Prop: Shri Sushil Kumar Gupta |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 May 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sushil Kumar Gupta |
| Land area | 11.7 acres (4.8 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Dedar |
| Taluk / tehsil | Tahrauli |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02840 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.7 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Dedar, Tahrauli, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Sand/ Morrum Mining — under environmental review, 1.3 km away
- River Bed Sand/ Morrum Mining — cleared for impact study, 1.3 km away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 3.2 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 3.4 km away
- Building Stone (Khanda, Gitti, Boulder, Ballast) Mining Project — environmental approval granted, 3.6 km away
- Building Stone (Khanda, Giiti, Boulder, Ballast) Mining Project — withdrawn, 3.6 km away
- Area 1.526 Ha Khanda Boulder Gitti Bailast Mining Project At Araji No.773,… — environmental approval granted, 3.6 km away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — lapsed, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.