Quick answers
What is this project?
Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project is a lapsed mining project in Musawali, Tahrauli, Jhansi, Uttar Pradesh. The site covers 3.5 acres.
Who is building it?
The applicant is Pramod Kumar.
Has it been approved?
No. The application was lapsed on 7 Nov 2024, so it is no longer under consideration.
Where is it?
In Musawali, Tahrauli, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 3.5 acres.
When was it filed?
The application was filed on 6 May 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Nov 2024 |
| Application filed | 6 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Pramod Kumar |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Musawali |
| Taluk / tehsil | Tahrauli |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01983 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.5 acres, this one is smaller than 78% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 31 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Musawali, Tahrauli, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Area 1.526 Ha Khanda Boulder Gitti Bailast Mining Project At Araji No.773,… — environmental approval granted, 100 m away
- Building Stone (Khanda, Gitti, Boulder, Ballast) Mining Project — environmental approval granted, 150 m away
- Building Stone (Khanda, Giiti, Boulder, Ballast) Mining Project — withdrawn, 150 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 250 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 400 m away
- River Bed Sand/ Morrum Mining — under environmental review, 2.5 km away
- River Bed Sand/ Morrum Mining — cleared for impact study, 2.5 km away
- Proposed project of Sand/Morrum Mining project at Gata No.- 02, Khand- 01,… — environmental approval granted, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.