What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Gautam Buddha Nagar, Uttar Pradesh

Proposed Expansion of Group Housing Project at Khasra No. 69m, 70m, 70mi, 71m, 71mi, 72m, 72mi, 73m, 73mi, 76m, 76mi, 77/2, 79mi

Proposed Expansion of Group Housing Project at Khasra No. 69m, 70m, 70mi, 71m, 71mi, 72m, 72mi, 73m, 73mi, 76m, 76mi, 77/2, 79mi is a proposed building project in Mahiuddinpur, Dadri, Noida, Uttar Pradesh. The site covers 7.1 acres. Its stated project cost is ₹600 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 Oct 2023).

See it on the live map All projects in Gautam Buddha Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Group Housing Project at Khasra No. 69m, 70m, 70mi, 71m, 71mi,…

Project details

Official titleProposed Expansion of Group Housing Project at Khasra No. 69m, 70m, 70mi, 71m, 71mi, 72m, 72mi, 73m, 73mi, 76m, 76mi, 77/2, 79mi at Village Chhajarsi, Distt Dadri, Gautam budh Nagar, Uttar Pradesh.
StatusCleared for impact study
Status since30 Oct 2023
Application filed30 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantRamprastha Urban Development Private Limited
Land area7.1 acres (2.9 ha)
Project cost₹600 crore
Village / localityMahiuddinpur
Taluk / tehsilDadri
DistrictGautam Buddha Nagar (Noida)
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00329

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 1 Feb 2024Environmental approval granted7.1 acres₹600 crore
Early planning filed 30 Oct 2023 (this page)Cleared for impact study7.1 acres₹600 crore

In context

430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.1 acres, this one is smaller than 56% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mahiuddinpur, Dadri, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Ramprastha Urban Development projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.