Project details
| Official title | Proposed Expansion of Group Housing Project at Khasra No. 69m, 70m, 70mi, 71m, 71mi, 72m, 72mi, 73m, 73mi, 76m, 76mi, 77/2, 79mi at Village Chhajarsi, Distt Dadri, Gautam budh Nagar, Uttar Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 Apr 2026 |
| Application filed | 1 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Ramprastha Urban Development Private Limited |
| Use | Residential |
| Units | 960 |
| Floors (tallest) | 33 |
| Basements | 2 |
| Height | 102 m |
| Parking spaces | 1,470 |
| Land area | 7.1 acres (2.9 ha) |
| Built-up area | 1,78,160 m² (19,17,696 sq ft) |
| Plot area | 28,697 m² (3,08,892 sq ft) |
| Project cost | ₹600 crore |
| Village / locality | Mahiuddinpur |
| Taluk / tehsil | Dadri |
| District | Gautam Buddha Nagar (Noida) |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01478 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 1 Feb 2024 (this page) | Environmental approval granted | 7.1 acres | ₹600 crore |
| Early planning filed 30 Oct 2023 | Cleared for impact study | 7.1 acres | ₹600 crore |
In context
430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.1 acres, this one is smaller than 56% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahiuddinpur, Dadri, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Proposed Group Housing Project at Khasra No. 69m, 70m,… — environmental approval granted, 0 m away
- Proposed Expansion of Group Housing Project at Khasra No. 69m, 70m, 70mi, 71m,… — cleared for impact study, 0 m away
- Revision & Expansion of the Group Housing Project "Hindon Green Valley" at… — lapsed, 850 m away
- Revision & Expansion of the Group Housing Project "Hindon Green Valley" at… — cleared for impact study, 850 m away
- Revision & Expansion of IT Campus "Green Boulevard" — under environmental review, 2.6 km away
- IT Infrastructure Park — environmental approval granted, 2.6 km away
- Expansion of IT-ITES Project — environmental approval granted, 3.6 km away
- Proposed Group Housing Project "Raj Residency" at Plot No. GC-03-01/GH-03,… — lapsed, 3.8 km away
All 3 Ramprastha Urban Development projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.