LapsedBuildings & townships · Gautam Buddha Nagar, Uttar Pradesh

Revision & Expansion of the Group Housing Project "Hindon Green Valley" at Khasra No:- 536, 540/1, 540/2 ,543 by M/s Rishabh Buildwell Pvt. Ltd

Revision & Expansion of the Group Housing Project "Hindon Green Valley" at Khasra No:- 536, 540/1, 540/2 ,543 by M/s Rishabh Buildwell Pvt. Ltd is a lapsed building project in Mahiuddinpur, Dadri, Noida, Uttar Pradesh. The site covers 0.2 acres. Its stated project cost is ₹200 crore. As of 27 Nov 2026, its status is “Lapsed” (since 8 Aug 2025).

See it on the live map All projects in Gautam Buddha Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Revision & Expansion of the Group Housing Project "Hindon Green Valley" at Khasra No:-…

Project details

Official titleRevision & Expansion of the Group Housing Project "Hindon Green Valley" at Khasra No:- 536, 540/1, 540/2 ,543 at Village - Mohiddinpur Kanawani, Ahinsa Khand-2, Indirapuram, Paragana-Loni, Tehsil- Dadri, District - Ghaziabad (U.P), Uttar Pradesh by M/s Rishabh Buildwell Pvt. Ltd.
StatusLapsed
Status since8 Aug 2025
Application filed10 Apr 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantRishabh Buildwell Private Limited
Land area1,000 m²
Project cost₹200 crore
Village / localityMahiuddinpur
Taluk / tehsilDadri
DistrictGautam Buddha Nagar (Noida)
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03461

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 10 Apr 2025 (this page)Lapsed0.2 acres₹200 crore
Early planning filed 24 Jun 2024Cleared for impact study0.2 acres₹200 crore

In context

430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.2 acres, this one is smaller than 99% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mahiuddinpur, Dadri, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.