Quick answers
What is this project?
Riverbed Sand/Morrum mining having lease area 16.00 ha along River Betwa in Khand No. 21/1 is a proposed mining project in Chandaut, Sarila, Hamirpur, Uttar Pradesh. The site covers 39.5 acres.
Who is building it?
The applicant is M/S Om Prakash Ram Aoutar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Chandaut, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 39.5 acres.
When was it filed?
The application was filed on 23 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand/Morrum mining having lease area 16.00 ha along River Betwa in Khand No. 21/1
Project details
| Official title | Riverbed Sand/Morrum mining having lease area 16.00 ha along River Betwa in Khand No. 21/1 at Village – Chandaut, Tehsil- Sarila, District- Hamirpur, Uttar Pradesh of M/s Om Prakash Ram Aoutar Prop: Smt Renu Gupta |
|---|---|
| Status | Cleared for impact study |
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | M/S Om Prakash Ram Aoutar |
| Land area | 39.5 acres (16 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Chandaut |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00355 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 39.5 acres | ₹1.1 crore |
| New project filed 7 Sept 2023 | Environmental approval granted | 39.5 acres | ₹1.1 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 39.5 acres, this one is smaller than 68% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Chandaut, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum mining having lease area 16.00 ha along River Betwa in… — environmental approval granted, 0 m away
- Sand/Morrum Mining along Betwa Riverbed in Khand No. 22/15, Gata no 35/1,… — lapsed, 3.7 km away
- "Sand/Morrum Mining" along Betwa Riverbed in Khand No – 22/15, Gata no 35/1,… — withdrawn, 3.7 km away
- Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area –… — environmental approval granted, 4.1 km away
- Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area –… — cleared for impact study, 4.1 km away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — under environmental review, 4.5 km away
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — initial checks, 4.8 km away
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — under environmental review, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.