Quick answers
What is this project?
Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area – 24.291 Ha Village- Chandaut Dariya, Tehsil- Sarila, District- Hamirpur, U.P is a proposed mining project in Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh. The site covers 60 acres.
Who is building it?
The applicant is Satya Prakash Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Dec 2025), as of 27 Nov 2026.
Where is it?
In Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 60 acres.
When was it filed?
The application was filed on 9 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area – 24.291 Ha…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 24 Dec 2025 |
| Application filed | 9 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Satya Prakash Gupta |
| Land area | 60 acres (24.3 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Chandaut Daria |
| Taluk / tehsil | Sarila |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02952 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Apr 2026 | Environmental approval granted | 60 acres | ₹60 lakh |
| Early planning filed 9 May 2025 (this page) | Cleared for impact study | 60 acres | ₹60 lakh |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 60 acres, this one is larger than 59% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 264.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining at Betwa River Bed, Gata No.- 35/1, Khand No.-22/14, Area –… — environmental approval granted, 0 m away
- Sand/Morrum Mining along Betwa Riverbed in Khand No. 22/15, Gata no 35/1,… — lapsed, 400 m away
- "Sand/Morrum Mining" along Betwa Riverbed in Khand No – 22/15, Gata no 35/1,… — withdrawn, 400 m away
- Proposed Project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — under environmental review, 500 m away
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — initial checks, 950 m away
- Chandaut Dariya, Chandaut Danda Sand/Morrum Mining Project (12.145Ha) — under environmental review, 950 m away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya,… — environmental approval granted, 950 m away
- "Sand/Morrum Mine" from Riverbed of Betwa River, Village- Rirua Basriya,… — cleared for impact study, 950 m away
More from Satya Prakash Gupta in Hamirpur
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted
- "Sand/Morrum Mining" along Betwa Riverbed in Khand No – 22/15, Gata no 35/1,… — withdrawn
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study
- "Sand/Morrum Mining" from Riverbed of Betwa River — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.