What is Developing? Open the mapMap

WithdrawnMining · Hamirpur, Uttar Pradesh

"Sand/Morrum Mining" along Betwa Riverbed in Khand No – 22/15, Gata no 35/1, 27/1, 439/3, 445/34, Total Area 24.291ha, Village – Chandaut Dariya, Chandaut Danda, Tehsil- Sarila, District- Hamirpur, U.P of M/s Anandeshwar Tradelinks

"Sand/Morrum Mining" along Betwa Riverbed in Khand No – 22/15, Gata no 35/1, 27/1, 439/3, 445/34, Total Area 24.291ha, Village – Chandaut Dariya, Chandaut Danda, Tehsil- Sarila, District- Hamirpur, U.P of M/s Anandeshwar Tradelinks is a withdrawn mining project in Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh. The site covers 60 acres. Its stated project cost is ₹56 lakh. As of 27 Nov 2026, its status is “Withdrawn” (since 5 Sept 2025).

See it on the live map All projects in Hamirpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Sand/Morrum Mining" along Betwa Riverbed in Khand No – 22/15, Gata no 35/1, 27/1, 439/3, 445/34, Total Area 24.291ha, Village – Chandaut Dariya, Chandaut Danda, Tehsil- Sarila, District- Hamirpur, U.P of M/s Anandeshwar Tradelinks is a withdrawn mining project in Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh. The site covers 60 acres.

Who is building it?

The applicant is Satya Prakash Gupta.

Has it been approved?

No. The application was withdrawn on 5 Sept 2025, so it is no longer under consideration.

Where is it?

In Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹56 lakh and a site of 60 acres.

When was it filed?

The application was filed on 5 Sept 2025.

Project details

StatusWithdrawn
Status since5 Sept 2025
Application filed5 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantSatya Prakash Gupta
Land area60 acres (24.3 ha)
Project cost₹56 lakh
Village / localityChandaut Daria
Taluk / tehsilSarila
DistrictHamirpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03021

In context

171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 60 acres, this one is larger than 59% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 120 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.

Where it is

Chandaut Daria, Sarila, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Satya Prakash Gupta in Hamirpur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.