Quick answers
What is this project?
"Sand/ Morrum Mining" Project at Araji No.- 1/1, Village- Pratappura, Tehsil- Garautha, District- Jhansi, U.P. (Applied Area : 16.0 ha.) M/s Maa Pitambara Construction, Prop.- Smt. Aruna Singh W/o Shri Pradeep Rajput is a proposed mining project in Pratappura, Garautha, Jhansi, Uttar Pradesh. The site covers 39.5 acres.
Who is building it?
The applicant is Aruna Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Oct 2023), as of 27 Nov 2026.
Where is it?
In Pratappura, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹57 lakh and a site of 39.5 acres.
When was it filed?
The application was filed on 30 Oct 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/ Morrum Mining" Project at Araji No.- 1/1, Village- Pratappura, Tehsil- Garautha,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Oct 2023 |
| Application filed | 30 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Aruna Singh |
| Land area | 39.5 acres (16 ha) |
| Project cost | ₹57 lakh |
| Village / locality | Pratappura |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00398 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Sept 2024 | Environmental approval granted | 39.5 acres | ₹57 lakh |
| Early planning filed 30 Oct 2023 (this page) | Cleared for impact study | 39.5 acres | ₹57 lakh |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 39.5 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Pratappura, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/ Morrum Mining" Project at Araji No.- 1/1, Village- Pratappura, Tehsil-… — environmental approval granted, 0 m away
- Sikarivyas Sand/Morrum Mining Project on Betwa River — environmental approval granted, 3.6 km away
- Sikarivyas Sand/Morrum Mining Project on Betwa River — cleared for impact study, 3.6 km away
- Tharro Sand/Morrum Mining Project — environmental approval granted, 4.2 km away
- Tharro Sand/Morrum Mining Project — cleared for impact study, 4.2 km away
- Transfer of the EC for the Short Term Lease of Sand/Morum Mining at Betwa River — returned to applicant, 4.7 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 4.7 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — environmental approval granted, 6.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.