Quick answers
What is this project?
Proposed Hectare Reserve Forest Land To Be Diverted To Uttar Pradesh Power Transmission Corporation Limited For Construction Of Proposed 132/33KV Transmission Substation, Ghatampur-II, Gata No. – 1345 Ka, Village Rampur, Forest Range Ghatampur, Social Forestry Division Kanpur, District- Kanpur , Uttar Pradesh is a proposed power project in Rampur, Ghatampur, Kanpur Nagar, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Ajay Kumar Burman.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Rampur, Ghatampur, Kanpur Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹84 crore; a site of 4.9 acres and 4.5 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 17 May 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 17 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Ajay Kumar Burman |
| Land area | 4.9 acres (2 ha) |
| Forest land | 4.5 acres (1.8 ha) |
| Project cost | ₹84 crore |
| Village / locality | Rampur |
| Taluk / tehsil | Ghatampur |
| District | Kanpur Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05382 |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rampur, Ghatampur, Kanpur Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.1 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.1 km away
- "Ordinary Sand Mine" from Riverbed of Yamuna River — environmental approval granted, 1.8 km away
- "Ordinary Sand Mine" from Riverbed of Yamuna River — cleared for impact study, 1.8 km away
- (3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project — lapsed, 2.3 km away
- (3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project — returned to applicant, 2.3 km away
- "Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.