(3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project is a lapsed power project in Rampur, Ghatampur, Kanpur Nagar, Uttar Pradesh. The site covers 2,468.1 acres.
Who is building it?
The applicant is Neyveli Uttar Pradesh Power Limited.
Has it been approved?
No. The application was lapsed on 12 Nov 2025, so it is no longer under consideration.
Where is it?
In Rampur, Ghatampur, Kanpur Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹14,375.4 crore and a site of 2,468.1 acres.
When was it filed?
The application was filed on 19 Jun 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Nov 2025 |
| Application filed | 19 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Neyveli Uttar Pradesh Power Limited |
| Land area | 2,468.1 acres (998.8 ha) |
| Project cost | ₹14,375.4 crore |
| Village / locality | Rampur |
| Taluk / tehsil | Ghatampur |
| District | Kanpur Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02873 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rampur, Ghatampur, Kanpur Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- (3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project — returned to applicant, 250 m away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 2.1 km away
- Proposed Hectare Reserve Forest Land To Be Diverted To Uttar Pradesh Power… — more information requested, 2.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 3 km away
- "Ordinary Sand Mine" from Riverbed of Yamuna River — environmental approval granted, 3.8 km away
- "Ordinary Sand Mine" from Riverbed of Yamuna River — cleared for impact study, 3.8 km away
- "Morrum Mining" from Riverbed of Yamuna River — environmental approval granted, 6.3 km away
More from Neyveli Uttar Pradesh Power Limited in Kanpur Nagar
- (3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project — returned to applicant
All 5 Neyveli Uttar Pradesh Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.