Quick answers
What is this project?
"Riverbed Sand Mine" from Yamuna River, Village- Patyora, (Khand No. 31/3, Area-36.437 Ha.) Tehsil- Hamirpur, District– Hamirpur, Uttar Pradesh Project Proponent- M/s Sharad Enterprises is a proposed mining project in Pateora Daria, Hamirpur, Uttar Pradesh. The site covers 90 acres.
Who is building it?
The applicant is Sharad Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Aug 2023), as of 27 Nov 2026.
Where is it?
In Pateora Daria, Hamirpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 90 acres.
When was it filed?
The application was filed on 23 Aug 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Riverbed Sand Mine" from Yamuna River, Village- Patyora, (Khand No. 31/3, Area-36.437…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Aug 2023 |
| Application filed | 23 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sharad Singh |
| Land area | 90 acres (36.4 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Pateora Daria |
| Taluk / tehsil | Hamirpur |
| District | Hamirpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00520 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Nov 2024 | Environmental approval granted | 90 acres | ₹1.8 crore |
| Early planning filed 23 Aug 2023 (this page) | Cleared for impact study | 90 acres | ₹1.8 crore |
In context
171 applications in Hamirpur since January 2022 are in the same category (Mining): 95 approved, 57 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 90 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Pateora Daria, Hamirpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Riverbed Sand Mine" from Yamuna River, Village- Patyora, (Khand No. 31/3,… — environmental approval granted, 0 m away
- Morrum Mining from Yamuna Riverbed — cleared for impact study, 1.2 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg,… — under environmental review, 1.6 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Surauli Buzurg,… — cleared for impact study, 1.6 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Patyora, Khand No.-… — lapsed, 1.6 km away
- SAND/MORRUM MINING ALONG YAMUNA RIVERBED at Khand No- 31/6, Gata No.- 01, 02,… — under environmental review, 2 km away
- Proposed Project of riverbed "Morrum Mining Project for River Yamuna at Gata… — cleared for impact study, 2.3 km away
- "Morrum Mine" Khand Sankhya-31/8, Gata No.- 01, 02, 03 over an area of 36.437… — environmental approval granted, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.