Quick answers
What is this project?
"Building stone (Sandstone)" Mine at Arazi/Gata No.- 185, Lease Area- 1.315 ha., Village- Kanchanpur, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh Developed by Shri Shyamji Singh is a proposed mining project in Kanchanpur, Chunar, Mirzapur, Uttar Pradesh. The site covers 3.3 acres.
Who is building it?
The applicant is Shyam Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Jun 2023), as of 27 Nov 2026.
Where is it?
In Kanchanpur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹84 lakh and a site of 3.3 acres.
When was it filed?
The application was filed on 8 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building stone (Sandstone)" Mine at Arazi/Gata No.- 185, Lease Area- 1.315 ha.,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Jun 2023 |
| Application filed | 8 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shyam Singh |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹84 lakh |
| Village / locality | Kanchanpur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00528 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Mar 2024 | Environmental approval granted | 3.3 acres | ₹84 lakh |
| Early planning filed 8 Jun 2023 (this page) | Cleared for impact study | 3.3 acres | ₹84 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.3 acres, this one is larger than 56% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 9.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 83 mining leases have applied within 5 km.
Where it is
Kanchanpur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 185, Lease Area- 1.315… — environmental approval granted, 0 m away
- "Building Stone (Sandstone)" Mine from Village- Baradih, Arazi/ Gata No.- 309,… — under environmental review, 250 m away
- Proposed Baradih Building Stone (Sandstone) Mining Project At Arazi No. 309,… — environmental approval granted, 300 m away
- "Building Stone (Sand Stone)" Project at Gata No.- 428 , Village- Dhuria,… — cleared for impact study, 450 m away
- Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project… — initial checks, 500 m away
- Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project… — cleared for impact study, 500 m away
- Dhuriya Building stone Sand Stone Mining project — environmental approval granted, 500 m away
- Dhuriya Building stone Sand Stone Mining project — more information requested, 500 m away
More from Shyam Singh in Mirzapur
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 180/2, Village- Bhagauti… — environmental approval granted
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 180/2, Village- Bhagauti… — cleared for impact study
- "Building stone (Sandstone)" Project at Gata No.-428, Village– Dhuria, Tehsil-… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.