What is Developing? Open the mapMap

Cleared for impact studyMining · Mirzapur, Uttar Pradesh

Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh.

Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres. Its stated project cost is ₹5.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 4 Jun 2025).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres.

Who is building it?

The applicant is Rajesh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 4 Jun 2025), as of 27 Nov 2026.

Where is it?

In Dhuria, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹5.7 crore and a site of 5 acres.

When was it filed?

The application was filed on 4 Oct 2024.

Project details

StatusCleared for impact study
Status since4 Jun 2025
Application filed4 Oct 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRajesh
Land area5 acres (2 ha)
Project cost₹5.7 crore
Village / localityDhuria
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01835

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Oct 2026Initial checks5 acres₹5.7 crore
Early planning filed 4 Oct 2024 (this page)Cleared for impact study5 acres₹5.7 crore

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5 acres, this one is larger than 70% of them.

22 other mining leases have applied within 500 m of this site; together with this one they cover 66.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 81 mining leases have applied within 5 km.

Where it is

Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.