Initial checksMining · Mirzapur, Uttar Pradesh

Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh.

Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres. Its stated project cost is ₹5.7 crore. As of 27 Nov 2026, its status is “Initial checks” (since 30 Oct 2026).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 5 acres.

Who is building it?

The applicant is Rajesh.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Dhuria, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹5.7 crore and a site of 5 acres.

When was it filed?

The application was filed on 30 Oct 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Area- 2.02 Ha Building Stone (Sandstone) Gitti. Boulder Patiya Mining Project Araji no.…

Project details

StatusInitial checks
Status since30 Oct 2026
Application filed30 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRajesh
Land area5 acres (2 ha)
Project cost₹5.7 crore
Village / localityDhuria
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-07468

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Oct 2026 (this page)Initial checks5 acres₹5.7 crore
Early planning filed 4 Oct 2024Cleared for impact study5 acres₹5.7 crore

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5 acres, this one is larger than 70% of them.

22 other mining leases have applied within 500 m of this site; together with this one they cover 66.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 81 mining leases have applied within 5 km.

Where it is

Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.