Quick answers
What is this project?
Riverbed Sand/Morrum Mining" along riverbed of Yamuna river at Gata No.468, Khand-3 Area-15.80 ha is a proposed mining project in Gauhani Kachhar, Sikandra, Kanpur Dehat, Uttar Pradesh. The site covers 39 acres.
Who is building it?
The applicant is Narayanan Builders & Developers Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Sept 2023), as of 27 Nov 2026.
Where is it?
In Gauhani Kachhar, Sikandra, Kanpur Dehat, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 39 acres.
When was it filed?
The application was filed on 14 Sept 2023.
Project details
| Official title | Riverbed Sand/Morrum Mining" along riverbed of Yamuna river at Gata No.468, Khand-3 Area-15.80 ha at Village- Gauhani Kachhar, Tehsil -Sikandara, District- Kanpur Dehat, Uttar Pradesh of M/s Narayanan Builders & Developers Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 14 Sept 2023 |
| Application filed | 14 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Narayanan Builders & Developers Private Limited |
| Land area | 39 acres (15.8 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Gauhani Kachhar |
| Taluk / tehsil | Sikandra |
| District | Kanpur Dehat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00533 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Dec 2024 | Lapsed | 39 acres | ₹90 lakh |
| Early planning filed 14 Sept 2023 (this page) | Cleared for impact study | 39 acres | ₹90 lakh |
In context
32 applications in Kanpur Dehat since January 2022 are in the same category (Mining): 21 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 39 acres, this one is larger than 63% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Gauhani Kachhar, Sikandra, Kanpur Dehat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Sand/Morrum Mining" along riverbed of Yamuna river at Gata No.468,… — lapsed, 0 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — environmental approval granted, 700 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — cleared for impact study, 700 m away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — under environmental review, 3.1 km away
- "Riverbed Sand/Morrum Mining" along riverbed of Yamuna River at Gata No.138,… — environmental approval granted, 3.5 km away
- "Riverbed Sand/Morrum Mining" along riverbed of Yamuna River at Gata No.138,… — cleared for impact study, 3.5 km away
- Sand/Morrum Deposit Quarry at Khand No.- 01, Gata No. 2059 & 2060, Village-… — environmental approval granted, 10 km away
- Sand/Morrum Deposit Quarry at Khand No.- 01, Gata No. 2059 & 2060, Village-… — cleared for impact study, 10 km away
All 4 Narayanan Builders & projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.