What is Developing? Open the mapMap

Cleared for impact studyMining · Kanpur Dehat, Uttar Pradesh

"Sand/Morrum Mine" from Riverbed of Yamuna River

"Sand/Morrum Mine" from Riverbed of Yamuna River is a proposed mining project in Gauhani Kachhar, Sikandra, Kanpur Dehat, Uttar Pradesh. The site covers 34.6 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 2 Sept 2023).

See it on the live map All projects in Kanpur Dehat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is "Sand/Morrum Mine" from Riverbed of Yamuna River?

"Sand/Morrum Mine" from Riverbed of Yamuna River is a proposed mining project in Gauhani Kachhar, Sikandra, Kanpur Dehat, Uttar Pradesh. The site covers 34.6 acres.

Who is building it?

The applicant is Dev Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 2 Sept 2023), as of 27 Nov 2026.

Where is it?

In Gauhani Kachhar, Sikandra, Kanpur Dehat, Uttar Pradesh.

How big is it?

It has a stated cost of ₹90 lakh and a site of 34.6 acres.

When was it filed?

The application was filed on 2 Sept 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mine" from Riverbed of Yamuna River

Project details

Official title"Sand/Morrum Mine" from Riverbed of Yamuna River at Village- Gauhani Kachchar, [Gata No. 468 (Khand-2), Area- 14.00 ha.] Tehsil- Sikandra, District- Kanpur Dehat, Uttar Pradesh, Project Proponent Shri Dev Singh
StatusCleared for impact study
Status since2 Sept 2023
Application filed2 Sept 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDev Singh
Land area34.6 acres (14 ha)
Project cost₹90 lakh
Village / localityGauhani Kachhar
Taluk / tehsilSikandra
DistrictKanpur Dehat
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00627

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 29 Oct 2024Environmental approval granted34.6 acres₹90 lakh
Early planning filed 2 Sept 2023 (this page)Cleared for impact study34.6 acres₹90 lakh

In context

32 applications in Kanpur Dehat since January 2022 are in the same category (Mining): 21 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 34.6 acres, this one is smaller than 69% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Gauhani Kachhar, Sikandra, Kanpur Dehat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.