Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Aug 2023 |
| Application filed | 10 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dayachand Badgoti |
| Land area | 23.6 acres (9.6 ha) |
| Project cost | ₹3 crore |
| Village / locality | Chhaprauli |
| Taluk / tehsil | Baraut |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00573 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Aug 2023 (this page) | Environmental approval granted | 23.6 acres | ₹3 crore |
| Early planning filed 10 Feb 2023 | Cleared for impact study | 23.6 acres | ₹3 crore |
In context
17 applications in Baghpat since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 23.6 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chhaprauli, Baraut, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Chhaprauli Khadar Ordinary Sand Mining project on Yamuna Riverbed — cleared for impact study, 0 m away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — environmental approval granted, 3.4 km away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — cleared for impact study, 3.4 km away
- Proposal of diversion of 0.1890 ha.PF LAND for Proposed Fuel Station Site Of… — forest land use approved, 5.2 km away
- Diversion of Protected Forest Land for Laying of Underground Gas Pipeling on… — under forest review, 6.4 km away
- Kotana Khadar Ordinary Sand Mining on Yamuna Riverbed Project — environmental approval granted, 12.8 km away
- Proposed expansion of existing Sugar unit from 8000 TCD to 10000 TCD by M/s… — environmental approval granted, 12.9 km away
- Proposed expansion of existing Sugar unit from 8000 TCD to 10000 TCD by M/s… — cleared for impact study, 12.9 km away
More from Dayachand Badgoti in Baghpat
- Kotana Khadar Ordinary Sand Mining on Yamuna Riverbed Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.