Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Yamuna River at Village- Badarkha Khadar, Gata No.- 1/2/1, Lease Area- 17.460 Ha., Tehsil– Baraut District– Baghpat, Uttar Pradesh, Project Proponent- M/s Aravalli Mines and Minerals/547853(Contact person- Smt Janki Devi) |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Feb 2026 |
| Application filed | 8 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Janki Devi |
| Land area | 43.1 acres (17.5 ha) |
| Project cost | ₹4.1 crore |
| Village / locality | Badarkha |
| Taluk / tehsil | Baraut |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03027 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Oct 2025 (this page) | Environmental approval granted | 43.1 acres | ₹4.1 crore |
| Early planning filed 6 Feb 2025 | Cleared for impact study | 43.1 acres | ₹4.1 crore |
In context
17 applications in Baghpat since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 43.1 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Badarkha, Baraut, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Yamuna River — cleared for impact study, 0 m away
- Proposed Chhaprauli Khadar Ordinary Sand Mining project on Yamuna Riverbed — cleared for impact study, 3.4 km away
- Proposed Chhaprauli Khadar Ordinary Sand Mining project on Yamuna Riverbed — environmental approval granted, 3.4 km away
- Proposal of diversion of 0.1890 ha.PF LAND for Proposed Fuel Station Site Of… — forest land use approved, 3.7 km away
- Diversion of Protected Forest Land for Laying of Underground Gas Pipeling on… — under forest review, 4.5 km away
- Kotana Khadar Ordinary Sand Mining on Yamuna Riverbed Project — environmental approval granted, 9.5 km away
- Diversion of forest land for approach access to IOCL Retail Outlet at Ch.… — forest land use approved, 10.3 km away
- Proposed expansion of existing Sugar unit from 8000 TCD to 10000 TCD by M/s… — environmental approval granted, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.