Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Aug 2023 |
| Application filed | 24 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dayachand Badgoti |
| Land area | 30.3 acres (12.3 ha) |
| Project cost | ₹4.2 crore |
| Village / locality | Kotana |
| Taluk / tehsil | Baraut |
| District | Baghpat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01172 |
In context
17 applications in Baghpat since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 30.3 acres, this one is larger than 59% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kotana, Baraut, Baghpat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land for approach access to IOCL Retail Outlet at Ch.… — forest land use approved, 8.1 km away
- Proposal of Diversion of Protected Forest Land for Access Permission to the… — more information requested, 9.1 km away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — environmental approval granted, 9.5 km away
- "Ordinary Sand Mining" from Riverbed of Yamuna River — cleared for impact study, 9.5 km away
- Proposed expansion of existing Sugar unit from 8000 TCD to 10000 TCD by M/s… — environmental approval granted, 9.6 km away
- Proposed expansion of existing Sugar unit from 8000 TCD to 10000 TCD by M/s… — cleared for impact study, 9.6 km away
- Diversion of Protected Forest Land for Laying of Underground Gas Pipeling on… — under forest review, 9.8 km away
- Proposal of diversion of 0.1890 ha.PF LAND for Proposed Fuel Station Site Of… — forest land use approved, 10.5 km away
More from Dayachand Badgoti in Baghpat
- Proposed Chhaprauli Khadar Ordinary Sand Mining project on Yamuna Riverbed — environmental approval granted
- Proposed Chhaprauli Khadar Ordinary Sand Mining project on Yamuna Riverbed — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.