What is Developing? Open the mapMap

Environmental approval grantedMining · Mahoba, Uttar Pradesh

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 1090/2, Village- Thana, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.405 ha.), Shri Dayal Singh S/o Late Shri Lafroo Singh

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 1090/2, Village- Thana, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.405 ha.), Shri Dayal Singh S/o Late Shri Lafroo Singh is an approved mining project in Thana, Mahoba, Uttar Pradesh. The site covers 1 acre. Its stated project cost is ₹66 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 May 2023).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 1090/2, Village- Thana, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 0.405 ha.), Shri Dayal Singh S/o Late Shri Lafroo Singh is an approved mining project in Thana, Mahoba, Uttar Pradesh. The site covers 1 acre.

Who is building it?

The applicant is Dayal Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 8 May 2023), as of 27 Nov 2026.

Where is it?

In Thana, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹66 lakh and a site of 1 acre.

When was it filed?

The application was filed on 8 May 2023.

Project details

StatusEnvironmental approval granted
Status since8 May 2023
Application filed8 May 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantDayal Singh
Land area1 acres (0.4 ha)
Project cost₹66 lakh
Village / localityThana
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00591

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 95% of them.

No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.

Where it is

Thana, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.