Quick answers
What is this project?
Building Stone or Khanda, Boulder, Ballast (Gitty) and Red Morrum mining project is an approved mining project in Paswara, Mahoba, Uttar Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Pawan Kumari.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Aug 2023), as of 27 Nov 2026.
Where is it?
In Paswara, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4.1 crore and a site of 9.9 acres.
When was it filed?
The application was filed on 14 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Aug 2023 |
| Application filed | 14 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pawan Kumari |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹4.1 crore |
| Village / locality | Paswara |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01340 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 24 have applied within 5 km.
Where it is
Paswara, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone Khanda,Boulder, Bailast (Gitti)" Project at Gata No.-841Mi… — environmental approval granted, 550 m away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.-841 Mi… — environmental approval granted, 700 m away
- Paswara Buiding Stone or Granite Khanda, Boulder, Baillast (Gitti) Mining… — environmental approval granted, 950 m away
- Paswara Buiding Stone or Granite Khanda, Boulder, Baillast (Gitti) Mining… — cleared for impact study, 950 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 2.2 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 2.2 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 3.3 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 3.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.