Project details
| Official title | Expansion of Existing Sugar Unit From 7500 Tcd to 15,000 Tcd Along With Expansion of Existing Co Gen Power Capacity From 25 MW to 50 MW Within Existing Industry Premises at Village-Loni, Tehsil: Shahabad, District– Hardoi, Uttar Pradesh by M/S Dcm Shriram LTD., Sugar Unit- Loni. |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 Oct 2023 |
| Application filed | 16 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Dcm Shriram Limited |
| Land area | 111.9 acres (45.3 ha) |
| Project cost | ₹707.6 crore |
| Village / locality | Loni |
| Taluk / tehsil | Shahabad |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00685 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 17 Apr 2024 | Environmental approval granted | 111.9 acres | ₹707.6 crore |
| Early planning filed 16 Oct 2023 (this page) | Cleared for impact study | 111.9 acres | ₹707.6 crore |
In context
20 applications in Hardoi since January 2022 are in the same category (Industry): 14 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 111.9 acres, this one is larger than 75% of them.
Where it is
Loni, Shahabad, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Sugar Unit From 7500 Tcd to 15,000 Tcd — environmental approval granted, 0 m away
- Protected Forest Land Proposed to Be Diverted for Entry and Exit Approach to… — more information requested, 6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 7.3 km away
- Riverbed Ordinary sand mining" having lease area- 6.8250 ha along river Garra… — environmental approval granted, 13.7 km away
- Riverbed Ordinary sand mining" having lease area- 6.8250 ha along river Garra… — cleared for impact study, 13.7 km away
- Riverbed Ordinary sand mining" having lease area- 6.8250 ha along river Garra… — cleared for impact study, 13.8 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit of Indian Oil… — more information requested, 14.2 km away
- Ordinary Earth Excavation Project at Gata No.- 104सं., 104मि., 104मि., 104मि.,… — under environmental review, 15.7 km away
All 5 Dcm Shriram projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.