Project details
| Official title | Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Shahabad-Lucknow Road (NH-731) Shahjahanpur District Boundy to HPCL Shanti Filling Center Ch. 114.265 to 123.860 (LHS) for Approx 9.595 Km in District-Hardoi, Uttar Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 17 Jul 2026 |
| Application filed | 5 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Sardarnagar |
| Taluk / tehsil | Shahabad |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07247 |
In context
5 applications in Hardoi since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Sardarnagar, Shahabad, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Ordinary sand mining" having lease area- 6.8250 ha along river Garra… — environmental approval granted, 6.5 km away
- Riverbed Ordinary sand mining" having lease area- 6.8250 ha along river Garra… — cleared for impact study, 6.5 km away
- Riverbed Ordinary sand mining" having lease area- 6.8250 ha along river Garra… — cleared for impact study, 6.5 km away
- Expansion of Existing Sugar Unit From 7500 Tcd to 15,000 Tcd — environmental approval granted, 7.3 km away
- Expansion of Existing Sugar Unit From 7500 Tcd to 15,000 Tcd — cleared for impact study, 7.3 km away
- Protected Forest Land Proposed to Be Diverted for Entry and Exit Approach to… — more information requested, 11.7 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit of Indian Oil… — more information requested, 20 km away
- Ordinary Earth Excavation Project at Gata No.- 104सं., 104मि., 104मि., 104मि.,… — under environmental review, 21.1 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Hardoi
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — forest land use approved
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
13 Hindustan Petroleum Corporation (HPCL) projects in Hardoi
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.