Quick answers
What is Building Stone (Sandstone) mine by Usha Devi?
Building Stone (Sandstone) mine by Usha Devi is an approved mining project in Roshanher, Chunar, Mirzapur, Uttar Pradesh. The site covers 6 acres.
Who is building it?
The applicant is Oosha Devi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Sept 2023), as of 27 Nov 2026.
Where is it?
In Roshanher, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 6 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Official title | Building Stone (Sandstone) mine in village- Chakjata Sonpur, Tehsil Chunar & District Mirzapur over an area of 2.424 ha. in Khasra/Gata no. 497 & 198 developed by Usha Devi |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Oosha Devi |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Roshanher |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00720 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Sept 2023 (this page) | Environmental approval granted | 6 acres | ₹1.5 crore |
| Early planning filed 6 Oct 2022 | Cleared for impact study | 6 acres | ₹1.5 crore |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 6 acres, this one is larger than 81% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 19.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 102 mining leases have applied within 5 km.
Where it is
Roshanher, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone (Sandstone) mine by Usha Devi — cleared for impact study, 0 m away
- Proposed Project of Building stone Sand Stone Mine of Smt. Vijeta Singh at… — more information requested, 400 m away
- Proposed Project of Building stone Sand Stone Mine of Smt. Vijeta Singh at… — cleared for impact study, 400 m away
- Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine… — environmental approval granted, 400 m away
- Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine… — cleared for impact study, 400 m away
- Chakjata Building stone Sand Stone Mining project — environmental approval granted, 450 m away
- Chakjata Building stone Sand Stone Mining project — cleared for impact study, 450 m away
- Building Stone (Sandstone) mine, at Gata No./Araji /Plot No. 1006, Lease Area:… — environmental approval granted, 500 m away
More from Oosha Devi in Mirzapur
- "Building Stone (Sandstone)" Mine from Village- Sindhora, Gata No.- 997 Mi,… — lapsed
- "Building Stone (Sandstone)" Mine from Village- Sindhora, Gata No.- 997 Mi,… — cleared for impact study
- BUILDING STONE(SANDSTONE) MINE by SMT. USHA DEVI — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.