Quick answers
What is this project?
Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine at Arazi No 1006, Area 1.21 ha is a proposed mining project in Suraha, Chunar, Mirzapur, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Akhilesh Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Jun 2023), as of 27 Nov 2026.
Where is it?
In Suraha, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹99 lakh and a site of 3 acres.
When was it filed?
The application was filed on 19 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine at Arazi No…
Project details
| Official title | Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine at Arazi No 1006, Area 1.21 ha in Village- Sariya, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh of Shri Akhilesh Kumar Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 19 Jun 2023 |
| Application filed | 19 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Akhilesh Singh |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹99 lakh |
| Village / locality | Suraha |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01107 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Oct 2024 | Environmental approval granted | 3 acres | ₹99 lakh |
| Early planning filed 19 Jun 2023 (this page) | Cleared for impact study | 3 acres | ₹99 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3 acres, this one is larger than 50% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 14.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 100 mining leases have applied within 5 km.
Where it is
Suraha, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine… — environmental approval granted, 0 m away
- Building Stone (Sandstone) mine, at Gata No./Araji /Plot No. 1006, Lease Area:… — environmental approval granted, 50 m away
- Proposed Project of Building stone Sand Stone Mine of Smt. Vijeta Singh at… — more information requested, 50 m away
- Proposed Project of Building stone Sand Stone Mine of Smt. Vijeta Singh at… — cleared for impact study, 50 m away
- Building Stone (Sandstone) mine, at Gata No. /Araji /Plot No. 1006, Lease… — environmental approval granted, 100 m away
- Building Stone (Sandstone) mine by Usha Devi — environmental approval granted, 400 m away
- Building Stone (Sandstone) mine by Usha Devi — cleared for impact study, 400 m away
- Chakjata Building stone Sand Stone Mining project — environmental approval granted, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.