What is Developing? Open the mapMap

Environmental approval grantedMining · Mirzapur, Uttar Pradesh

Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine at Arazi No 1006, Area 1.21 ha

Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine at Arazi No 1006, Area 1.21 ha is an approved mining project in Suraha, Chunar, Mirzapur, Uttar Pradesh. The site covers 3 acres. Its stated project cost is ₹99 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Nov 2025).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine at Arazi No 1006, Area 1.21 ha is an approved mining project in Suraha, Chunar, Mirzapur, Uttar Pradesh. The site covers 3 acres.

Who is building it?

The applicant is Akhilesh Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 18 Nov 2025), as of 27 Nov 2026.

Where is it?

In Suraha, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹99 lakh and a site of 3 acres.

When was it filed?

The application was filed on 21 Oct 2024.

Project details

Official titleProposed Project of Building stone or Sand Stone Khanda, Boulder, Gitti Mine at Arazi No 1006, Area 1.21 ha in Village- Sariya, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh of Shri Akhilesh Kumar Singh
StatusEnvironmental approval granted
Status since18 Nov 2025
Application filed21 Oct 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantAkhilesh Singh
Land area3 acres (1.2 ha)
Project cost₹99 lakh
Village / localitySuraha
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02407

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 Oct 2024 (this page)Environmental approval granted3 acres₹99 lakh
Early planning filed 19 Jun 2023Cleared for impact study3 acres₹99 lakh

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3 acres, this one is larger than 50% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 14.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 100 mining leases have applied within 5 km.

Where it is

Suraha, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.