Project details
| Official title | Building stone (Khanda, Gitty, Boulder, Red Morrum) Mining Project in Gata No-1078, Khand No-23, Lease area 2.0240 ha at Village - Gonda, Tehsil-Karwi, District-Chitrakoot, U.P. of Shri Rajendra Kumar Sharma |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Jun 2023 |
| Application filed | 17 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajendra Sharma |
| Land area | 5 acres (2 ha) |
| Project cost | ₹97 lakh |
| Village / locality | Gonda |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00766 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 5 acres | ₹97 lakh |
| New project filed 17 Jun 2023 (this page) | Environmental approval granted | 5 acres | ₹97 lakh |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 85% of them.
16 other mining leases have applied within 500 m of this site; together with this one they cover 74.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Gonda, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to UPEIDA Plans a 15-Kilometre Chitrakoot Link Expressway in Uttar Pradesh (7.2 km away).
Other projects nearby
- Building stone (Khanda, Gitty, Boulder, Red Morrum) Mining Project in Gata… — cleared for impact study, 0 m away
- Proposed Project of Granite Gitti, Khanda / Boulder And Pahadi Red Morrum Mine… — under environmental review, 100 m away
- Proposed Project of Granite Gitti, Khanda / Boulder And Pahadi Red Morrum Mine… — cleared for impact study, 100 m away
- Proposed "Granite Gitti, Khanda / Boulders" Project at Gata No.- 1078 / 19,… — environmental approval granted, 200 m away
- Proposed "Granite Gitti, Khanda / Boulders" Project at Gata No.- 1078 / 19,… — cleared for impact study, 200 m away
- "Building Stone (Granite Khanda / Gitti / Boulder)" Project at Gata No.- 1078… — environmental approval granted, 200 m away
- "Building Stone (Granite Khanda / Gitti / Boulder)" Project at Gata No.- 1078… — cleared for impact study, 200 m away
- Proposed "Granite Gitti, Khanda / Boulder)" Project at Gata No.- 1078 Ga Khand… — environmental approval granted, 200 m away
More from Rajendra Sharma in Chitrakoot
- Building stone (Granite Khanda, Gitty, Boulder, Red Morrum) Mining Project in… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.