Quick answers
What is this project?
Proposed expansion in development of "Shri Ram Janma Bhoomi Teerth Kshetra" by increasing built up area from 15815.72 sqm to 143665.00 sqm is an approved building project in Kot Ram Chandar, Faizabad, Ayodhya, Uttar Pradesh. The site covers 68.8 acres.
Who is building it?
The applicant is Shri Ram Janmbhoomi Teerth Kshetra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Aug 2023), as of 27 Nov 2026.
Where is it?
In Kot Ram Chandar, Faizabad, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,400 crore and a site of 68.8 acres.
When was it filed?
The application was filed on 23 Aug 2023.
Project details
| Official title | Proposed expansion in development of "Shri Ram Janma Bhoomi Teerth Kshetra" by increasing built up area from 15815.72 sqm to 143665.00 sqm at village – Kot Ramchander, Avadh Khas, Jalwanpura, Tehsil & District - Ayodhya, Uttar Pradesh by Shri Ram Janma Bhoomi Teerth Kshetra (Trust). |
|---|---|
| Status | Environmental approval granted |
| Status since | 23 Aug 2023 |
| Application filed | 23 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Shri Ram Janmbhoomi Teerth Kshetra |
| Land area | 68.8 acres (27.8 ha) |
| Project cost | ₹1,400 crore |
| Village / locality | Kot Ram Chandar |
| Taluk / tehsil | Faizabad |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00889 |
In context
15 applications in Ayodhya since January 2022 are in the same category (Buildings & townships): 11 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 68.8 acres, this one is larger than 73% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kot Ram Chandar, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hotel Project — environmental approval granted, 1.3 km away
- Environmental Clearance of Hotel and Commercial Project at Gata No. 309 and… — environmental approval granted, 1.4 km away
- Ordinary sand mining at Gata No. 2769 Mi., River Ghaghara, Village Durgaganj,… — under environmental review, 2.3 km away
- Ayodhya Barrage Project" with CCA 20000 Ha across River Saryu (Ghaghara),… — initial checks, 2.8 km away
- Ayodhya Barrage Project with CCA 20000 Ha across River Saryu (Ghaghra),… — lapsed, 2.8 km away
- Museum of Indian Temple Architecture, Ayodhya, U.P. — environmental approval granted, 2.8 km away
- Lemon Tree Premier Hotel — under environmental review, 3.3 km away
- Lemon Tree Premier Hotel — withdrawn, 3.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.