What is Developing? Open the mapMap

WithdrawnBuildings & townships · Ayodhya, Uttar Pradesh

Lemon Tree Premier Hotel

Lemon Tree Premier Hotel is a withdrawn building project in Shah Newazipur Manjha, Faizabad, Ayodhya, Uttar Pradesh. The site covers 1.1 acres. Its stated project cost is ₹314 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 20 May 2026).

See it on the live map All projects in Ayodhya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Lemon Tree Premier Hotel?

Lemon Tree Premier Hotel is a withdrawn building project in Shah Newazipur Manjha, Faizabad, Ayodhya, Uttar Pradesh. The site covers 1.1 acres.

Who is building it?

The applicant is Rj Corp Limited.

Has it been approved?

No. The application was withdrawn on 20 May 2026, so it is no longer under consideration.

Where is it?

In Shah Newazipur Manjha, Faizabad, Ayodhya, Uttar Pradesh.

How big is it?

It has a stated cost of ₹314 crore and a site of 1.1 acres.

When was it filed?

The application was filed on 20 May 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Lemon Tree Premier Hotel

Project details

StatusWithdrawn
Status since20 May 2026
Application filed20 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRj Corp Limited
Land area1.1 acres (0.5 ha)
Project cost₹314 crore
Village / localityShah Newazipur Manjha
Taluk / tehsilFaizabad
DistrictAyodhya
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04653

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Jul 2026Under environmental review1.1 acres₹3.1 crore
New project filed 20 May 2026 (this page)Withdrawn1.1 acres₹314 crore

In context

15 applications in Ayodhya since January 2022 are in the same category (Buildings & townships): 11 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 93% of them.

29 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shah Newazipur Manjha, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Rj Corp projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.