Quick answers
What is this project?
Ordinary sand mining at Gata No. 2769 Mi., River Ghaghara, Village Durgaganj, Tehsil Tarabganj, District Gonda, Uttar Pradesh is a proposed mining project in Dullapur, Faizabad, Ayodhya, Uttar Pradesh. The site covers 59.3 acres.
Who is building it?
The applicant is Kanhaiya Sharma.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Dullapur, Faizabad, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹95 lakh and a site of 59.3 acres.
When was it filed?
The application was filed on 25 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 25 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kanhaiya Sharma |
| Land area | 59.3 acres (24 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Dullapur |
| Taluk / tehsil | Faizabad |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07596 |
In context
57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 59.3 acres, this one is larger than 91% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Dullapur, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Museum of Indian Temple Architecture, Ayodhya, U.P. — environmental approval granted, 2.1 km away
- Proposed expansion in development of "Shri Ram Janma Bhoomi Teerth Kshetra" by… — environmental approval granted, 2.3 km away
- Ayodhya Barrage Project" with CCA 20000 Ha across River Saryu (Ghaghara),… — initial checks, 2.5 km away
- Ayodhya Barrage Project with CCA 20000 Ha across River Saryu (Ghaghra),… — lapsed, 2.5 km away
- Hotel Project — environmental approval granted, 3.4 km away
- Environmental Clearance of Hotel and Commercial Project at Gata No. 309 and… — environmental approval granted, 3.5 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — environmental approval granted, 4.4 km away
- Proposed project of Riverbed of Ghaghra River Ordinary Sand Mining at Gata No.… — under environmental review, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.