One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Grain Based Distillery Capacity – 200 Kld by M/S Maa Sheetla Ventures Limited
Project details
| Official title | Establishment of Proposed Grain Based Distillery Capacity – 200 Kld Along With Co Gen Power of 4.5 MW at Village: Dilra Raipur, Tehsil & Distt–moradabad, Uttar Pradesh by M/S Maa Sheetla Ventures Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 27 Mar 2023 |
| Application filed | 27 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/S Maa Sheetla Ventures Limited |
| Land area | 17.5 acres (7.1 ha) |
| Project cost | ₹200 crore |
| Village / locality | Dilari Raipur |
| Taluk / tehsil | Moradabad |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00903 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jul 2024 | Environmental approval granted | 17.5 acres | ₹200 crore |
| Early planning filed 27 Mar 2023 (this page) | Cleared for impact study | 17.5 acres | ₹200 crore |
In context
20 applications in Moradabad since January 2022 are in the same category (Industry): 13 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 17.5 acres, this one is smaller than 67% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dilari Raipur, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Maa Sheetla Ventures… — environmental approval granted, 0 m away
- Grain Based Ethanol Dstillery of Capacity 380 Kld — lapsed, 0 m away
- Area: 0.621 Ha. "Ordinary Soil Excavation" Project at Gata No.– 700 — environmental approval granted, 850 m away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to… — forest land use approved, 1.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 3.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nursing Home of… — lapsed, 4.2 km away
- Re-diversion of Proposed forest land to be diverted for Entry/Exit approach to… — forest land use approved, 4.7 km away
- Proposed "Ordinary Soil Excavation" Project at Gata No.– 787 & 911 ग — environmental approval granted, 5 km away
All 5 Maa Sheetla Ventures projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.