Project details
| Official title | Proposed Establishment of Grain Based Ethanol Dstillery of Capacity 380 Kld Along With Co Gen Power Plant – 10.5 MW at Village- Dilra Raipur, Tehsil & Distt – Moradabad (U.P.) M/S Maa Sheetla Ventures Limited |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 19 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Maasheetla Ventures Limited |
| Land area | 19.4 acres (7.9 ha) |
| Project cost | ₹401.3 crore |
| Village / locality | Dilari Raipur |
| Taluk / tehsil | Moradabad |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01733 |
In context
20 applications in Moradabad since January 2022 are in the same category (Industry): 13 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 19.4 acres, this one is larger than 56% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dilari Raipur, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Maa Sheetla Ventures… — environmental approval granted, 0 m away
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Maa Sheetla Ventures… — cleared for impact study, 0 m away
- Area: 0.621 Ha. "Ordinary Soil Excavation" Project at Gata No.– 700 — environmental approval granted, 850 m away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to… — forest land use approved, 1.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 3.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nursing Home of… — lapsed, 4.2 km away
- Re-diversion of Proposed forest land to be diverted for Entry/Exit approach to… — forest land use approved, 4.7 km away
- Proposed "Ordinary Soil Excavation" Project at Gata No.– 787 & 911 ग — environmental approval granted, 5 km away
All 3 Maasheetla Ventures projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.