Project details
| Official title | Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet in Village:- Bhensiya, Tehsil:- Moradabad, District:- Moradabad |
|---|---|
| Status | Forest land use approved |
| Status since | 8 Oct 2024 |
| Application filed | 21 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1,700 m² |
| Forest land | 540 m² |
| Project cost | ₹55 lakh |
| Village / locality | Bhensia |
| Taluk / tehsil | Moradabad |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06350 |
In context
20 applications in Moradabad since January 2022 are in the same category (Fuel stations): 15 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.4 acres, this one is smaller than 80% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhensia, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Nursing Home of… — lapsed, 1.5 km away
- Re-diversion of Proposed forest land to be diverted for Entry/Exit approach to… — forest land use approved, 2.3 km away
- Protected Forest Land Proposed for Diversion for Entry/Exit Approach to… — forest land use approved, 2.7 km away
- Area: 0.621 Ha. "Ordinary Soil Excavation" Project at Gata No.– 700 — environmental approval granted, 3 km away
- Grain Based Ethanol Dstillery of Capacity 380 Kld — lapsed, 3.3 km away
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Maa Sheetla Ventures… — environmental approval granted, 3.3 km away
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Maa Sheetla Ventures… — cleared for impact study, 3.3 km away
- Proposed Reserved Forest Land to Be Diverted for Construction of Foundations… — lapsed, 3.5 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Moradabad
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Retail Outlet by Hindustan Petroleum Corp. Ltd. at Km. Ch. 28.047 on… — forest land use approved
- Proposed HPCL Retail Outlet on Thakurdwara-Moradabad Road NH-734 (Old SH-41)… — forest land use approved
4 Hindustan Petroleum Corporation (HPCL) projects in Moradabad
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.