What is this project?
Sand/Morrum Mine from Riverbed of Betwa River, Village- Simiriya, (Khand No.- 864/320, 865/320, Area-27.53 Ha.) Tehsil- Orai, District– Jalaun, Uttar Pradesh Developed by M/s Parihar Construction (Shri Balwant Singh and Shri Dushyant Singh) is a proposed mining project in Simariya, Orai, Jalaun, Uttar Pradesh. The site covers 68 acres.
Who is building it?
The applicant is Dushyant Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 May 2023), as of 27 Nov 2026.
Where is it?
In Simariya, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 68 acres.
When was it filed?
The application was filed on 27 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand/Morrum Mine from Riverbed of Betwa River, Village- Simiriya, (Khand No.- 864/320,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 May 2023 |
| Application filed | 27 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dushyant Singh |
| Land area | 68 acres (27.5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Simariya |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00907 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Dec 2023 | Environmental approval granted | 68 acres | ₹1.5 crore |
| Early planning filed 27 May 2023 (this page) | Cleared for impact study | 68 acres | ₹1.5 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 68 acres, this one is larger than 96% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 135.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.
Where it is
Simariya, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Simiriya, (Khand No.-… — environmental approval granted, 0 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 864/320, 865/320,… — under environmental review, 100 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 1.1 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — cleared for impact study, 1.1 km away
- Riverbed Sand/Morrum Mining from Nizi Bhoomi over an area of 1.710 ha at Gata… — initial checks, 1.2 km away
- Environmental Clearance of Proposed River Bed Sand/Morrum Mining From Riverbed… — environmental approval granted, 1.8 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 861, 861/12,… — under environmental review, 2 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 2.2 km away
More from Dushyant Singh in Jalaun
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.