Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Simariya, Orai, Jalaun, Uttar Pradesh. The site covers 7.7 acres.
Who is building it?
The applicant is Surendra Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Dec 2024), as of 27 Nov 2026.
Where is it?
In Simariya, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 7.7 acres.
When was it filed?
The application was filed on 27 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Sand/Morrum Mining" from Riverbed of Betwa River
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village-Simeriya, Gata No.- 860/19, Lease Area- 3.112 ha., Tehsil- Orai, District- Jalaun, Uttar Pradesh, Project Proponent- - Shri Surendra Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 9 Dec 2024 |
| Application filed | 27 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Surendra Singh |
| Land area | 7.7 acres (3.1 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Simariya |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01871 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Feb 2025 | Environmental approval granted | 7.7 acres | ₹75 lakh |
| Early planning filed 27 Sept 2024 (this page) | Cleared for impact study | 7.7 acres | ₹75 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.7 acres, this one is smaller than 95% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 11.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.
Where it is
Simariya, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 0 m away
- Riverbed Sand/Morrum Mining from Nizi Bhoomi over an area of 1.710 ha at Gata… — initial checks, 100 m away
- Environmental Clearance of Proposed River Bed Sand/Morrum Mining From Riverbed… — environmental approval granted, 700 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 861, 861/12,… — under environmental review, 900 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 864/320, 865/320,… — under environmental review, 1 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 1.1 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Simiriya, (Khand No.-… — environmental approval granted, 1.1 km away
- Sand/Morrum Mine from Riverbed of Betwa River, Village- Simiriya, (Khand No.-… — cleared for impact study, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.