What is Developing? Open the mapMap

Under environmental reviewMining · Jalaun, Uttar Pradesh

Proposed Project of "Sand/Morrum Mine" located at Gata No. 864/320, 865/320, Village – Simiriya Tehsil- Orai, District- Jalaun (U.P.)M/s Parihar Construction Shri Balwant Singh,Lease Area: 27.470 Ha.

Proposed Project of "Sand/Morrum Mine" located at Gata No. 864/320, 865/320, Village – Simiriya Tehsil- Orai, District- Jalaun (U.P.)M/s Parihar Construction Shri Balwant Singh,Lease Area: 27.470 Ha is a proposed mining project in Simiriya, Orai, Jalaun, Uttar Pradesh. The site covers 67.9 acres. Its stated project cost is ₹30 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 30 Jul 2026).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Project of "Sand/Morrum Mine" located at Gata No. 864/320, 865/320, Village – Simiriya Tehsil- Orai, District- Jalaun (U.P.)M/s Parihar Construction Shri Balwant Singh,Lease Area: 27.470 Ha is a proposed mining project in Simiriya, Orai, Jalaun, Uttar Pradesh. The site covers 67.9 acres.

Who is building it?

The applicant is Parihar Construction.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Simiriya, Orai, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹30 lakh and a site of 67.9 acres.

When was it filed?

The application was filed on 10 Sept 2025.

Project details

StatusUnder environmental review
Status since30 Jul 2026
Application filed10 Sept 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantParihar Construction
Land area67.9 acres (27.5 ha)
Project cost₹30 lakh
Village / localitySimiriya
Taluk / tehsilOrai
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02893

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 67.9 acres, this one is larger than 95% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 135.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Simiriya, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Parihar Construction in Jalaun

4 Parihar Construction projects in Jalaun
All 29 Parihar Construction projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.